The Best Time to Start Planning Your Kitchen Remodel

 

A kitchen remodel is one of the most exciting upgrades a homeowner can make, but also one of the most complex. Between choosing finishes, coordinating schedules, and managing budgets, timing can make or break your experience. So when should you start planning your kitchen renovation?

 

Plan 4–6 Months in Advance

Experts recommend starting your kitchen remodeling plans four to six months before your desired start date. That may sound like a lot of time, but it allows you to handle the many moving parts without feeling rushed.

Here’s why that timeframe matters:

  • Cabinet lead times: Many cabinet vendors have delivery windows ranging from 6 to 12 weeks, depending on the style and customization.

  • Contractor scheduling: Reputable contractors are typically booked two to three months out, sometimes longer during peak seasons.

  • Permit approvals: Local building permits in Massachusetts can take several weeks to process, especially for structural changes or electrical and plumbing updates.

By starting early, you avoid stressful delays and have time to make confident, informed decisions on design, materials, and layout.

 

Account for Every Dollar, Even Takeout

A kitchen remodel doesn’t just mean paying for construction and materials. Many homeowners underestimate the hidden costs, especially when it comes to eating out.

According to the U.S. Bureau of Labor Statistics, the average American household spends $328 per month on food away from home, and that number can easily double during a kitchen renovation when cooking isn’t possible. Setting aside a “takeout budget” in your renovation plan can help prevent sticker shock later.

Additionally, it’s smart to reserve 10–20% of your total renovation budget for unexpected expenses like change orders, material shortages, or structural surprises behind the walls.

 

Allow Time for Design and Decision-Making

The design phase is where your dream kitchen takes shape, but it’s also where indecision can cause costly delays. Giving yourself ample time to select materials like flooring, countertops, and lighting ensures your project moves smoothly once construction begins.

When working with your contractor:

  • Review design renderings early and request revisions if needed.

  • Confirm finish selections at least one month before the start date.

  • Order long-lead items (cabinets, appliances, specialty fixtures) first.

Being proactive gives you flexibility and peace of mind, ensuring that everything arrives and aligns perfectly with your timeline.

 

Set Yourself Up for a Stress-Free Remodel

The difference between a stressful renovation and a smooth one often comes down to preparation. By planning months in advance, communicating clearly with your contractor, and budgeting for both the expected and the unexpected, you can enjoy the transformation rather than endure it.

Ready to start planning your kitchen remodel? Create a simple checklist today:

  1. Choose your ideal start date.

  2. Schedule design consultations.

  3. Research and contact local contractors.

  4. Establish your total budget—including 10–20% for contingencies.

  5. Begin selecting materials and finishes.

Start early, plan smart, and watch your dream kitchen come to life without the chaos.

Get a Price

Social Media

GoogleYelp

Sending your message. Please wait...

There was a problem sending your message. Please try again or call us.

Please complete all the fields in the form before sending.

You may only send 3 messages per day, but you are welcome to call us!

The phone number is invalid. Please check your phone number and try again.

The email address is invalid. Please check your email address and try again.

Thanks for contacting us! We'll get back to you shortly.